Skip to content
MatrixAILORAWAN
Three Phase LoRaWAN Panel Meter — LoRaWAN Energy Meters

Energy Meters

Three Phase LoRaWAN Panel Meter

  • LoRaWAN
  • AC
  • Indoor

Panel-mount three-phase power analyzer with LoRaWAN uplink, large backlit display, and comprehensive power quality measurements.

Specifications

PhasesThree Phase
MountingPanel Mount (96×96mm)
Voltage3×400V AC
ParameterskWh, kVArh, PF, THD
CommunicationLoRaWAN
Display4.5-digit LCD with backlight
ProtectionIP52 (front)
CertificationsCE, MID

Specifications may vary by model and region. Final selection is confirmed during solution design.

Applications

Where the Three Phase LoRaWAN Panel Meter is used

Electricity submetering is the most common first step in a building IoT project: it shows where energy goes, allocates cost to tenants and cost centres, and exposes waste that never appears on a monthly utility bill.

  • Tenant and cost-centre energy allocation in commercial towers and mixed-use developments
  • HVAC, chiller, pump and lift energy monitoring for FM teams
  • Main incomer and maximum-demand monitoring
  • Solar PV generation and self-consumption tracking
  • Consumption anomaly alerts, such as equipment left running out of hours

How it connects

The Three Phase LoRaWAN Panel Meter is a native LoRaWAN device. It joins any standard LoRaWAN network through a gateway and a network server such as ChirpStack, using the EU868 frequency plan commonly used in the UAE. Its uplinks are decoded on the network server and delivered to your platform, BMS or CAFM over MQTT or REST.

LoRaWAN network design →

Installation notes for UAE projects

  • Meter rooms in UAE towers are often in basements or risers; we confirm LoRaWAN coverage there during the RF survey, or add an indoor gateway or LoRa Mesh hop.
  • Existing Modbus meters do not need replacing: a Modbus-to-LoRaWAN converter can poll several meters on one RS485 bus.
  • CT ratio, wiring (3P3W or 3P4W) and register map are recorded during commissioning so readings are correct from day one.
  • Interval data (typically 15 minutes) is delivered to your BMS, CAFM, billing system or dashboard over MQTT or REST.

FAQ

Energy Meters — questions

Can these meters be used for tenant billing?

Meters used for billing should carry the appropriate accuracy class and certification, and the billing process must follow your utility and regulatory obligations. We confirm the right model during design.

How often do LoRaWAN energy meters report?

Typical intervals are 5 to 30 minutes. The interval is chosen to balance data resolution against network airtime, especially on large meter fleets.

Do I need to replace existing Modbus meters?

Usually not. Existing Modbus RTU meters can be connected wirelessly through a Modbus-to-LoRaWAN converter, which polls the registers and sends them as LoRaWAN uplinks.

Selecting devices for a project?

Tell us about your site, assets and existing systems. A LoRaWAN specialist will review your requirements and propose a practical architecture — no obligation.